{"_id":"57991b99ebcc7419003c0cda","project":"56539c418b050e2100f006ca","user":"55ef2835e7f5490d000c0e4f","version":{"_id":"56539c428b050e2100f006cd","project":"56539c418b050e2100f006ca","__v":12,"createdAt":"2015-11-23T23:07:46.327Z","releaseDate":"2015-11-23T23:07:46.327Z","categories":["56539c428b050e2100f006ce","5789af34f55bf80e00d0c34f","5789af4e6a16260e006e7cd4","5789af53d7bf751900e3cbe1","5789af576a16260e006e7cd5","5789af5fc1c3de0e00169dc7","5789af64c1c3de0e00169dc8","5789b0067a572c0e00120269","579919b1b8d3432000fdffc3","590ba9d1030acd0f00f07046","5939cecbc78839000f4bff0e","59c4454a414f98001001f2a9"],"is_deprecated":false,"is_hidden":false,"is_beta":false,"is_stable":true,"codename":"","version_clean":"1.0.0","version":"1.0"},"__v":1,"category":{"_id":"590ba9d1030acd0f00f07046","version":"56539c428b050e2100f006cd","__v":0,"project":"56539c418b050e2100f006ca","sync":{"url":"","isSync":false},"reference":false,"createdAt":"2017-05-04T22:23:13.717Z","from_sync":false,"order":2,"slug":"monthly-planner","title":"Monthly Planner"},"parentDoc":null,"updates":[],"next":{"pages":[],"description":""},"createdAt":"2016-07-27T20:37:45.316Z","link_external":false,"link_url":"","githubsync":"","sync_unique":"","hidden":false,"api":{"results":{"codes":[]},"settings":"","auth":"required","params":[],"url":""},"isReference":false,"order":5,"body":"[block:api-header]\n{\n  \"type\": \"basic\",\n  \"title\": \"Unscheduled Work\"\n}\n[/block]\nIt's easy to plan out work for a whole year as all you need to do is drag & drop the task tiles between months or the **Unscheduled Work** column. Tasks that have been set as either **Fixed** or **Variable** will automatically move to their correct sections and can't be moved between the two. \n[block:image]\n{\n  \"images\": [\n    {\n      \"image\": [\n        \"https://files.readme.io/7653b4c-Screen_Shot_2016-08-02_at_5.09.38_PM.png\",\n        \"Screen Shot 2016-08-02 at 5.09.38 PM.png\",\n        184,\n        604,\n        \"#e2e6e6\"\n      ],\n      \"sizing\": \"original\"\n    }\n  ]\n}\n[/block]\nAll unscheduled tasks are displayed in the **Unscheduled Work** column on the right. A task is unscheduled if it does not have a **Planned Date**. Tasks can be scheduled by dragging and dropping into a month in the planner, which will set the **Planned Date** to the first day of the month. \n\nThe **Unscheduled Work** column can also be filtered to help you find a particular task. Just use the search bar at the top of the column and enter the name or client of the task you're looking for.\n[block:image]\n{\n  \"images\": [\n    {\n      \"image\": [\n        \"https://files.readme.io/032c7c9-Screen_Shot_2016-08-02_at_5.16.17_PM.png\",\n        \"Screen Shot 2016-08-02 at 5.16.17 PM.png\",\n        186,\n        606,\n        \"#e4e6e6\"\n      ],\n      \"sizing\": \"original\"\n    }\n  ]\n}\n[/block]\nYou can also schedule a task by [editing](http://help.planrightapp.com/docs/updating-tasks#the-edit-task-modal) it and assigning it a **Planned Date**.","excerpt":"","slug":"scheduling-work","type":"basic","title":"Scheduling Tasks"}
[block:api-header] { "type": "basic", "title": "Unscheduled Work" } [/block] It's easy to plan out work for a whole year as all you need to do is drag & drop the task tiles between months or the **Unscheduled Work** column. Tasks that have been set as either **Fixed** or **Variable** will automatically move to their correct sections and can't be moved between the two. [block:image] { "images": [ { "image": [ "https://files.readme.io/7653b4c-Screen_Shot_2016-08-02_at_5.09.38_PM.png", "Screen Shot 2016-08-02 at 5.09.38 PM.png", 184, 604, "#e2e6e6" ], "sizing": "original" } ] } [/block] All unscheduled tasks are displayed in the **Unscheduled Work** column on the right. A task is unscheduled if it does not have a **Planned Date**. Tasks can be scheduled by dragging and dropping into a month in the planner, which will set the **Planned Date** to the first day of the month. The **Unscheduled Work** column can also be filtered to help you find a particular task. Just use the search bar at the top of the column and enter the name or client of the task you're looking for. [block:image] { "images": [ { "image": [ "https://files.readme.io/032c7c9-Screen_Shot_2016-08-02_at_5.16.17_PM.png", "Screen Shot 2016-08-02 at 5.16.17 PM.png", 186, 606, "#e4e6e6" ], "sizing": "original" } ] } [/block] You can also schedule a task by [editing](http://help.planrightapp.com/docs/updating-tasks#the-edit-task-modal) it and assigning it a **Planned Date**.