{"_id":"5a8dd99f8d847a0046b915b7","project":"56539c418b050e2100f006ca","version":{"_id":"56539c428b050e2100f006cd","project":"56539c418b050e2100f006ca","__v":14,"createdAt":"2015-11-23T23:07:46.327Z","releaseDate":"2015-11-23T23:07:46.327Z","categories":["56539c428b050e2100f006ce","5789af34f55bf80e00d0c34f","5789af4e6a16260e006e7cd4","5789af53d7bf751900e3cbe1","5789af576a16260e006e7cd5","5789af5fc1c3de0e00169dc7","5789af64c1c3de0e00169dc8","5789b0067a572c0e00120269","579919b1b8d3432000fdffc3","590ba9d1030acd0f00f07046","5939cecbc78839000f4bff0e","59c4454a414f98001001f2a9","5a8b9193e4eb600012e90dea","5b511e0bfe048400034364d8"],"is_deprecated":false,"is_hidden":false,"is_beta":false,"is_stable":true,"codename":"","version_clean":"1.0.0","version":"1.0"},"category":{"_id":"5a8b9193e4eb600012e90dea","project":"56539c418b050e2100f006ca","version":"56539c428b050e2100f006cd","__v":0,"sync":{"url":"","isSync":false},"reference":false,"createdAt":"2018-02-20T03:10:11.603Z","from_sync":false,"order":2,"slug":"getting-started-guide","title":"Getting Started Guide"},"user":"5a84d1bf6b17d200124fa3ea","githubsync":"","__v":0,"parentDoc":null,"updates":[],"next":{"pages":[],"description":""},"createdAt":"2018-02-21T20:42:07.402Z","link_external":false,"link_url":"","sync_unique":"","hidden":false,"api":{"results":{"codes":[]},"settings":"","auth":"required","params":[],"url":""},"isReference":false,"order":9,"body":"[block:api-header]\n{\n  \"title\": \"Using colour codes\"\n}\n[/block]\nPlanRight uses colour codes to show you how much capacity a staff member has. Days in the past can be green, light orange or dark orange. Days in the future can be red or blue. \n[block:image]\n{\n  \"images\": [\n    {\n      \"image\": [\n        \"https://files.readme.io/2c0ecc2-Colour_codes.png\",\n        \"Colour codes.png\",\n        1222,\n        101,\n        \"#c6753f\"\n      ],\n      \"caption\": \"Colour codes show staff capacity.\"\n    }\n  ]\n}\n[/block]\n##  Days in the past\n**Green**: Met or exceeded daily target\n**Orange: **Very light orange means the staff member nearly met their target. Dark orange means they logged time, but did not come close to their target. The darker the orange, the less time they logged.\n\n\n[block:image]\n{\n  \"images\": [\n    {\n      \"image\": [\n        \"https://files.readme.io/34a9f5b-Andreas_butler_-_past_capacity.png\",\n        \"Andreas butler - past capacity.png\",\n        549,\n        206,\n        \"#cdd1d8\"\n      ],\n      \"caption\": \"Andreas Butler met or exceeded his target on Monday and Tuesday, did not log very much time on Wednesday, Thursday or Friday, and nearly met his target on the following Monday.\"\n    }\n  ]\n}\n[/block]\n## Days in the future\n**Blue:** Very light blue means that a staff member has been assigned some tasks, but still has lots of capacity. Very dark blue means that a staff member is at capacity. The darker the blue, the less capacity they have. \n**Red:** Staff member is over capacity\n**White:** Staff member has not been assigned to any tasks. \n[block:image]\n{\n  \"images\": [\n    {\n      \"image\": [\n        \"https://files.readme.io/9244bff-Screen_Shot_2018-02-21_at_12.38.12_PM.png\",\n        \"Screen Shot 2018-02-21 at 12.38.12 PM.png\",\n        754,\n        222,\n        \"#d0a3c6\"\n      ],\n      \"caption\": \"Mack Radar has lots of capacity on Monday, the 26th, and he is at his capacity for the rest of that week. He is over capacity for the entire week of the 5th through 9th. He has nothing scheduled on the weekends, because he doesn't work weekends.\"\n    }\n  ]\n}\n[/block]","excerpt":"","slug":"colour-codes-in-planright","type":"basic","title":"Colour codes in PlanRight"}

Colour codes in PlanRight


[block:api-header] { "title": "Using colour codes" } [/block] PlanRight uses colour codes to show you how much capacity a staff member has. Days in the past can be green, light orange or dark orange. Days in the future can be red or blue. [block:image] { "images": [ { "image": [ "https://files.readme.io/2c0ecc2-Colour_codes.png", "Colour codes.png", 1222, 101, "#c6753f" ], "caption": "Colour codes show staff capacity." } ] } [/block] ## Days in the past **Green**: Met or exceeded daily target **Orange: **Very light orange means the staff member nearly met their target. Dark orange means they logged time, but did not come close to their target. The darker the orange, the less time they logged. [block:image] { "images": [ { "image": [ "https://files.readme.io/34a9f5b-Andreas_butler_-_past_capacity.png", "Andreas butler - past capacity.png", 549, 206, "#cdd1d8" ], "caption": "Andreas Butler met or exceeded his target on Monday and Tuesday, did not log very much time on Wednesday, Thursday or Friday, and nearly met his target on the following Monday." } ] } [/block] ## Days in the future **Blue:** Very light blue means that a staff member has been assigned some tasks, but still has lots of capacity. Very dark blue means that a staff member is at capacity. The darker the blue, the less capacity they have. **Red:** Staff member is over capacity **White:** Staff member has not been assigned to any tasks. [block:image] { "images": [ { "image": [ "https://files.readme.io/9244bff-Screen_Shot_2018-02-21_at_12.38.12_PM.png", "Screen Shot 2018-02-21 at 12.38.12 PM.png", 754, 222, "#d0a3c6" ], "caption": "Mack Radar has lots of capacity on Monday, the 26th, and he is at his capacity for the rest of that week. He is over capacity for the entire week of the 5th through 9th. He has nothing scheduled on the weekends, because he doesn't work weekends." } ] } [/block]